Insulated Shipping Kit 24hour — supplied across India by Wedge Industries Limited.
Wedge 24 hour insulated shipping kit
A box on its own is not a cold chain. The kit is the box, the right PCM at the right phase-change temperature, the liner, and the packout instruction — specified together against a 24 hour lane so the payload actually arrives in band.
What is in the kit
| Target duration | 24 hour |
|---|---|
| Insulated box | EPP or VIP, sized to payload |
| Coolant | PCM packs, phase-change temperature selected to payload |
| Liner | Payload liner and dunnage |
| Documentation | Conditioning and packout instruction |
Why kits fail
Almost always because the PCM was not conditioned correctly, or the wrong phase-change temperature was used. Both are addressed in the packout instruction supplied with every Wedge kit.
Quote-only product. Send payload temperature, door-to-door duration and annual volume for a priced quotation with the thermal calculation behind it. Supplied across India by Wedge Industries Limited.




