Prefab Labour Camp & Worker Accommodation
Wedge Industries Limited builds prefab labour camps, worker dormitories, site offices, canteens and toilet blocks from insulated steel-frame and PUF sandwich panels — factory-made, flat-packed and erected in days, then dismantled and moved to the next site. 50–100 mm insulated walls, from ₹1,583/sq ft, supplied across India and exported to the Gulf.

What is a prefab labour camp?
A prefab labour camp is temporary or semi-permanent worker accommodation — dormitories, kitchens, dining halls, toilets and site offices — built from factory-made insulated panels on a steel frame instead of brick and block. Because every wall, roof and floor panel is cut in the factory, a camp for hundreds of workers can be erected in weeks, kept cool in summer and warm in winter, and moved to the next project when the contract ends. That makes a prefab labour camp faster, cleaner and cheaper over its life than masonry or bare steel porta-cabins.
EPC contractors, real-estate developers, highway, metro and power projects, refineries, mines and oil field operators all use prefab worker accommodation to mobilise quickly and meet the living standards their clients and authorities set for workers.
Prefab labour camp buildings we supply
Worker dormitories
Single- or two-storey dormitory blocks with rooms planned to your headcount and bed layout, corridor or veranda access, windows, fans or AC provision and lockers.
Kitchens, canteens & dining halls
Wash-down wall linings, large clear spans for dining, exhaust and utility provision; add a prefab cold room for food stores.
Toilet & wash blocks
Moisture-safe cement-faced panels, fitted plumbing and drainage, laundry and shower rooms connected to the dormitory blocks.
Site offices & meeting rooms
Insulated site offices and portable cabins with electrical, AC provision, pantry and glass-wall manager rooms.
Security cabins & stores
Compact steel cabins, pods and capsule units for gates, first-aid rooms and tool stores.
Staff quarters
Engineer and supervisor housing as 1–2 BHK prefab buildings, with better finishes on the same camp layout.

Labour camp wall and roof panel options
| System | Wall build-up | Insulation | Best for |
|---|---|---|---|
| CSP-50 cement-faced PUF panel | 50 mm: 2 × 10 mm fibre cement + 30 mm poured PUF, 2440 × 1220 mm | Core R 1.36 m²K/W, λ 0.022 W/m·K | Economical 50 mm walls and internal partitions; safe in monsoon and coastal humidity |
| CSP-74 cement-faced PUF panel | 74 mm: 2 × 12 mm fibre cement + 50 mm PUF | Core R 2.27 m²K/W | External walls for hot climates |
| Steel-faced PUF sandwich panel | 50–200 mm, pre-painted galvanised steel, 1000–1200 mm wide, up to 12 m long | λ 0.022–0.024 W/m·K | Fast walls and insulated roofs over large dormitory and dining blocks |
| LGSF + MgO + rock wool | G550 steel frame, MgO board both sides, 75 mm rock wool core | Non-combustible, acoustic | Longer-life camps and staff quarters; frame designed to IS 800 / IS 801 and IS 875 wind loads |
Values from Wedge product data sheets. Roofs use insulated PUF panels or an LGSF roof with insulation; existing sheds can be upgraded with spray foam insulation.

Prefab labour camp price
| Unit | Size | Price (ex-GST) | Typical use in a camp |
|---|---|---|---|
| Readymade steel cabin | 300 sq ft | ₹4.75–10.5 lakh (₹1,583–3,500/sq ft) | Security cabin, store, small dorm room |
| Pod unit | 200 sq ft | ₹7–15 lakh | Supervisor room, first-aid room |
| Capsule unit | 300 sq ft | ₹10.5–22 lakh | Engineer quarters, site office |
| Dormitory, kitchen and toilet blocks | To layout | Quoted per sq ft on your drawing and headcount | Main worker accommodation |
Prices exclude GST, foundation and transport. Large camps are priced per sq ft against the approved layout, panel system and finishes, in ₹ for India and $ for export. Use the budget quote calculator for a first figure.
Prefab labour camp vs masonry and bare porta-cabins
| Aspect | Masonry camp | Bare steel porta-cabin | Wedge prefab labour camp |
|---|---|---|---|
| Build time | Months | Days | Days to erect after 30–45 days factory production |
| Thermal comfort | Heavy, slow to cool | Very hot in summer | Insulated 50–100 mm walls and roof |
| Relocation | Demolished | Movable | Dismantle and re-erect |
| Moisture and hygiene | Damp, cracks | Condensation, rust | Cement-faced panels, sealed joints |
| Fire | Non-combustible | Depends on lining | MgO / fibre cement facings; fire-rated options |

How we deliver a prefab labour camp
- Brief: headcount, site location, climate, number of blocks, facilities and target date.
- Layout and price: our engineers prepare the camp layout, panel system and a priced BOQ in ₹ or $.
- Manufacture: frames and panels are made in 30–45 days and shipped flat-packed by truck or container.
- Erection: Wedge crews or your contractor assemble the blocks on a simple plinth; electrical, plumbing and finishes follow.
- Relocation: at project end the camp is dismantled and re-erected at the next site.
Worker accommodation for India, the Gulf and export projects
Wedge Industries Limited supplies prefab labour camps to construction, infrastructure and industrial sites across India — from our Faridabad works for Delhi NCR to Lucknow, Kanpur and the UP defence corridor — and exports worker accommodation panels and kits to 45+ countries, including the UAE, Saudi Arabia, Qatar, Kuwait and Oman, where insulated walls matter most in 45–50 °C summers.
India’s Building Materials & Technology Promotion Council recognises light-gauge steel and sandwich panel systems as emerging construction technologies — the same systems used in Wedge prefab worker accommodation.
Get a prefab labour camp quote
Send the number of workers, site location, blocks needed (dormitory, kitchen, toilets, offices) and start date. A layout and priced offer in ₹ or $ follows within 24–48 hours.
Prefab labour camp FAQs
How much does a prefab labour camp cost?
Single units start from about ₹1,583 per sq ft for an entry steel cabin (₹4.75 lakh for 300 sq ft), excluding GST, foundation and transport. Dormitory, kitchen and toilet blocks are priced per sq ft on your layout, headcount, panel system and finishes.
How fast can a labour camp be built?
Frames and panels are manufactured in 30–45 days; each block is then erected on site in days. Standard cabins and pods can ship sooner from stock kits.
What wall thickness is used for worker accommodation?
50 mm cement-faced PUF panels (CSP-50) are the economical choice for walls and partitions. For hot climates and longer stays, 74–100 mm PUF panels or an LGSF wall with 75 mm rock wool give better insulation and acoustic comfort.
Can a prefab labour camp be relocated?
Yes. Panels and frames are bolted and screwed, so blocks can be dismantled at the end of a project and re-erected at the next site, which lowers the cost per project.
Are prefab labour camps fire safe?
Wedge camps use fibre cement or MgO board facings, and can add rock wool cores, fire-rated doors and firestop seals where the client or authority requires higher fire ratings.
Do you export labour camps to the Gulf?